Return to site

Transforming a Vancouver Apartment into a Luxurious Oasis: A Multigroup Contracting Case Study in Shangri-La Building at 1128 West Georgia Street

Experience the High-End Finishes and Seamless Permitting Process of a Luxury Renovation in One of Vancouver's Most Iconic Buildings

March 29, 2023

Multigroup Contracting had the pleasure of renovating a luxurious apartment located in the prestigious Shangri-La building in Vancouver. The Shangri-La tower is an iconic symbol of Vancouver's modern and dynamic skyline and was designed by James K.M. Cheng Architects and built by Westbank Corp. When it was completed in 2009, the tower was the tallest building in Canada, standing at 201 meters tall. The tower houses both a luxury hotel and private residences, including the luxurious apartment that was recently renovated by Multigroup Contracting.

The owners of the apartment were looking to update their space with modern finishes and high-end appliances while also ensuring that the renovation was completed in a timely and efficient manner. The renovation began with a consultation with the owners to determine their vision for the space. Our team of designers worked closely with the owners to create a design plan that met their specific needs and desires. This included updating the kitchen and bathrooms, installing new flooring throughout the apartment, and adding custom millwork and lighting.

The renovation included updating the kitchen and bathrooms, installing new flooring throughout the apartment, and adding custom millwork and lighting. The design plan focused on creating a space that was both functional and luxurious. For the kitchen, we installed custom cabinetry with soft-close drawers, marble countertops, and top-of-the-line appliances, including a built-in espresso machine and wine fridge. The bathrooms were updated with sleek, modern fixtures, including a large soaker tub and a rainfall showerhead. Throughout the apartment, we installed new flooring and added custom millwork to provide additional storage and display space.

The renovation of a luxurious apartment in the Shangri-La building required obtaining the necessary permits from the building management. Our team worked closely with the management to ensure that all necessary permits were obtained, and that the renovation was completed in compliance with building codes and regulations. The permitting process was completed seamlessly, ensuring that the renovation was completed on time and on budget.

The use of high-end finishes was a key component of the renovation. The owners of the apartment wanted to ensure that their space was luxurious and modern, and to achieve this, we used high-end finishes such as marble countertops, custom cabinetry, and top-of-the-line appliances. The bathrooms were updated with sleek, modern fixtures, while the kitchen was outfitted with high-end appliances, including a built-in espresso machine and wine fridge. The new finishes transformed the space into a functional and luxurious oasis.

The owners of the apartment were thrilled with the outcome of the renovation. They commented on how the new finishes and appliances had completely transformed their space, making it both functional and luxurious. The custom millwork and lighting provided additional storage and display space while also adding a touch of elegance to the apartment. The owners were especially impressed with the level of communication and attention to detail that Multigroup Contracting provided throughout the renovation process.

Throughout the renovation process, communication was a key component of our success. Our team of professionals ensured that the owners were kept up-to-date with the progress of the renovation, and that their vision was being met every step of the way. Our team of designers, project managers, and tradespeople worked together seamlessly to complete the renovation on time and on budget, with no surprises or delays.

In conclusion, the renovation of a luxurious apartment located in the iconic Shangri-La building in Vancouver was a resounding success thanks to the efforts of Multigroup Contracting. The use of high-end finishes and appliances, along with custom millwork and lighting, transformed the space into a functional and luxurious oasis. The permitting process was completed seamlessly, ensuring that the renovation was completed on time and on budget. The owners were thrilled with the outcome and highly recommend Multigroup Contracting for any renovation project. Contact us today to learn more about our services.