Return to site
Return to site

Transforming a Limited Space into a Luxurious Oasis: A Multigroup Contracting Case Study in The Melville Building, Vancouver

Discover the challenges and solutions of a luxury ensuite bathroom renovation in The Melville building, 1189 Melville Street, Vancouver with Multigroup Contracting.

Multigroup Contracting was approached by the owners of an ensuite bathroom in The Melville building, located at 1189 Melville Street in Vancouver, to renovate their outdated and worn bathroom into a modern oasis. The bathroom was in need of significant updates, including new plumbing fixtures, tiling, and cabinetry. Our team of experts worked closely with the homeowners to develop a design plan that met their specific needs and desires, while also ensuring that the renovation was completed on time and within budget.

The first issue that we faced during the renovation process was the limited space available in the bathroom. The bathroom was small, and there was limited space to work with. Our team of designers had to carefully plan the layout to ensure that the space was used efficiently, while also ensuring that the new fixtures and cabinetry were functional and aesthetically pleasing. We were able to overcome this issue by designing custom cabinetry and using high-quality materials that were both functional and space-saving.

Another issue that we faced during the renovation was the age of the building. The Melville building was constructed in 2007, and the existing plumbing and electrical systems were outdated and required significant updates to meet current building codes and regulations. Our team of experts worked closely with the building management to ensure that all necessary permits were obtained, and that the renovation was completed in compliance with building codes and regulations.

The design plan for the bathroom renovation focused on creating a space that was both functional and luxurious. For the bathroom, we installed custom cabinetry with soft-close drawers, marble countertops, and high-end fixtures, including a rainfall showerhead and freestanding tub. The tiles used were imported from Italy, and were specifically chosen to create a sense of luxury and elegance within the small space.

 

"The team at Multigroup Contracting exceeded our expectations with the renovation of our ensuite bathroom in The Melville building. They were able to overcome the various challenges that came with renovating an older building, while still creating a space that was functional and luxurious. We couldn't be happier with the outcome and highly recommend their services."

- Happy Homeowners.

 

Throughout the renovation process, our team worked closely with the homeowners to ensure that their vision for the space was being met. We provided regular updates on the progress of the renovation and addressed any concerns that the homeowners had throughout the process. Our team also worked diligently to ensure that the renovation was completed on time and within budget.

The homeowners were thrilled with the final outcome of the renovation. They were impressed with how the space had been transformed into a functional and luxurious oasis. The custom cabinetry and high-end finishes provided additional storage and display space while also adding a touch of elegance to the space. The homeowners commented on how the new fixtures and cabinetry had completely transformed their bathroom into a space that they were proud to show off to their guests.

The renovation of the ensuite bathroom in The Melville building was a success thanks to the efforts of Multigroup Contracting. Our team of experts overcame various challenges, including limited space and outdated building systems, to create a functional and luxurious space that the homeowners were thrilled with. Contact us today to learn more about our services and how we can transform your space into a functional and luxurious oasis.

 

Subscribe
Previous
Transforming a Vancouver Apartment into a Luxurious Oasis...
Next
What I wish I knew before finishing basement?
 Return to site
Cookie Use
We use cookies to improve browsing experience, security, and data collection. By accepting, you agree to the use of cookies for advertising and analytics. You can change your cookie settings at any time. Learn More
Accept all
Settings
Decline All
Cookie Settings
Necessary Cookies
These cookies enable core functionality such as security, network management, and accessibility. These cookies can’t be switched off.
Analytics Cookies
These cookies help us better understand how visitors interact with our website and help us discover errors.
Preferences Cookies
These cookies allow the website to remember choices you've made to provide enhanced functionality and personalization.
Save