Return to site
Return to site

Silicone plasters

The ultimate guide to silicone plasters

Created on the basis of silicone resins, silicone plasters are superior to other plasters in all respects, especially in their pronounced water-repellent properties and their ability to self-clean from rainwater, as well as to wash.

Silicone plasters provide high color stability and conditions for easy maintenance of cleanliness of facades. The water on the wet plaster forms discrete water droplets. This effect ensures effective protection of the surface and prevents the contaminants contained in the atmospheric air from sticking to the surface of the facade. The introduction of special additives in the composition of plasters increases their effectiveness and provides permanent protection against biological effects. At the same time, when deposits are deposited on the surface, they do not penetrate into the structure of the plaster. Due to their much lower alkalinity (pH value close to neutral), silicone plasters give a better chance of preserving the color than mineral and silicate plasters.

This type of plaster is suitable for application on reinforced putties in all thermal insulation systems, on lime, lime-cement and cement plasters, concrete and other mineral bases (putty masses), as well as on old (with good adhesion) mineral, silicate and disperse paints. and plasters, organically bonded putties, gypsum plasters and gypsum boards. Not suitable for application on fresh lime plasters, synthetic materials and resins, varnishes or oil coatings, lean paints.

It can be said that these are the best plasters available on the market, and accordingly this reflects on their price.

Read more about the different types of plasters

Subscribe
Previous
Silicate plasters
Next
Types of plasters according to the structure
 Return to site
All Posts
×

Almost done…

We just sent you an email. Please click the link in the email to confirm your subscription!

OK