Return to site
Return to site

Polymer (acrylic) plasters

The ultimate guide to polymer (acrylic) plasters

They use various synthetic resins for binders. They are produced in the widest color range and are suitable for all types of surface treatments. They can produce bright and intense tones, and silicone plasters are second only to lower vapor permeability and carbon dioxide permeability.

Polymer plaster is the cheapest option of plasters. As a final coating, it is thin-layered, pasty, with a scratched or dragged structure. It is suitable for indoor and outdoor use - it can be applied on facades, interior walls, on mineral plasters and ground coats, on concrete, as well as on thermal insulation. The plastering can be both machine and manual.

It is resistant to weather conditions, highly elastic, highly water-repellent, vapor-permeable, washable, allows brilliant coloring. It has high resistance to mechanical impacts.

Read more about the different types of plasters

Subscribe
Previous
Mineral plasters
Next
Silicate plasters
 Return to site