Return to site
Return to site

How Do Smart Homes Function ?

A Closer Look of How Smart Homes Function

As Internet Of Things becomes more popular in Vancouver,BC more clients than ever ask us what constitutes a modern smart home. A smart home is one that can monitor the family, maintain preset living conditions and create the safety and comfort of its occupants. Today we're going to take a closer look at how it works, and how we can manage it.

Network Management

In addition to the traditional electrical installations, smart control systems have additional control networks in place that can rival those of the most modern commercial, municipal and hospital buildings. Smart appliances are much easier to implement in new construction than in an already built dwelling, since they are created on the principle of the electricity grid. Often, the control grid is powered by solar panels.

Placing a network control in each room allows all rooms to be connected to a common computer system, which through appropriate software ensures the automatic maintenance of predetermined comfortable conditions throughout the house.

Remote control

Currently there are systems in place that can provide integrated remote control of everything in the home - from surveillance cameras through lighting to temperature and appliances controls. Some types of systems have both a central dashboard and a unified remote control unit. Home appliances can be controlled via the power grid, but some appliances can be controlled remotely with your mobile phone. For example, with your smartphone, you can easily operate the washing machine or track the expiration date of the food in a smart refrigerator.

Security

Smart home technology can improve the general security in your home. Features that can keep track of children, pets, and activities around the property. From cameras that monitor entrances and alleys, to motion sensors that activate lighting - all of these small items can make your family's life easier, such as automatically lighting the way to the bathroom or kitchen at night. The security cameras can be used as well to impede home invasion. Through special radio frequency identifiers, systems can recognize family members when entering the home. If the system detects a stranger entering the home, it identifies it as a thief and automatically notifies the authorities and the homeowners.

Furthermore...
The cost of different home management systems is different and depends on how many features you choose to include. There are multiple options however easiest way to get into converting your home to a smart one you can start with security and temperature controls. However, if you are building a new home and want to automate it, contact us in advance to schedule a no obligation consultation with one of our licensed and highly skilled in-house designers in order to save yourself the cost of repairs later.

Subscribe
Previous
Next
Renovating and Budgeting for a New Kitchen
 Return to site
All Posts
×

Almost done…

We just sent you an email. Please click the link in the email to confirm your subscription!

OK