Return to site

Homeowner's Guide to Asbestos: Understanding the Risks and Proper Handling

Understanding and Safely Managing Asbestos in Your Home

April 3, 2023

Asbestos is a term used to describe a group of naturally occurring minerals that have long been valued for their unique properties, such as resistance to heat, fire, and chemicals. Despite its usefulness in many industries, asbestos poses significant health risks when improperly handled. This guide aims to educate homeowners about asbestos, its dangers, types, and related illnesses, as well as how to handle it safely and understand its historical use in buildings.

What is Asbestos?

Asbestos refers to six types of naturally occurring silicate minerals with long, thin fibrous crystals. These minerals can be divided into two main categories: serpentine and amphibole asbestos. Serpentine asbestos, which includes chrysotile (white asbestos), has curly fibers, while amphibole asbestos, which includes crocidolite (blue asbestos), amosite (brown asbestos), and other less common types, has straight, needle-like fibers.

Asbestos fibers are incredibly durable and resistant to heat, fire, and chemicals, making them an attractive material for various applications, particularly in the construction industry. However, when asbestos-containing materials are disturbed or damaged, they can release microscopic fibers into the air, which can then be inhaled or ingested, leading to severe health issues.

Why is Asbestos Dangerous?

Asbestos is dangerous because its microscopic fibers can easily become airborne when materials containing it are disturbed or damaged. These fibers, when inhaled or ingested, can become lodged in the lungs or other organs, leading to inflammation, scarring, and, eventually, serious health problems. The risks associated with asbestos exposure depend on factors such as the concentration of fibers in the air, the duration of exposure, and individual susceptibility.

It is important to note that asbestos-containing materials are not necessarily dangerous if they are in good condition and not disturbed. The danger arises when these materials are damaged, releasing fibers into the air.

Types of Asbestos

There are six recognized types of asbestos, which are categorized into two groups: serpentine and amphibole asbestos.

  • Serpentine Asbestos: This group includes chrysotile (white asbestos), which is the most commonly used type of asbestos. Chrysotile's curly fibers are less likely to be inhaled and less likely to cause health problems compared to the straight fibers of amphibole asbestos. However, chrysotile is still considered dangerous and carcinogenic.
  • Amphibole Asbestos: This group includes crocidolite (blue asbestos), amosite (brown asbestos), anthophyllite, tremolite, and actinolite. Amphibole asbestos has straight, needle-like fibers that are more easily inhaled and more likely to cause health problems than chrysotile.

Asbestos-Related Illnesses

Asbestos exposure can lead to several severe health issues, including:

  • Asbestosis: This is a chronic lung disease caused by the inhalation of asbestos fibers. Asbestosis leads to scarring and inflammation of lung tissue, making it difficult to breathe. The symptoms of asbestosis include shortness of breath, persistent cough, chest pain, and fatigue.
  • Lung Cancer: Asbestos exposure significantly increases the risk of developing lung cancer, especially for smokers. Symptoms of lung cancer can include persistent cough, chest pain, shortness of breath, and unexplained weight loss.

Mesothelioma: This is a rare and aggressive form of cancer that primarily affects the lining of the lungs (pleural mesothelioma) but can also affect the lining of the abdomen (peritoneal mesothelioma) or the heart (pericardial mesothelioma). Mesothelioma is almost exclusively linked to asbestos exposure. Symptoms of mesothelioma can include chest pain, shortness of breath, fatigue, and unexplained weight loss.

  • Pleural Thickening: This is a non-cancerous condition in which the lining of the lungs (pleura) becomes thickened and less flexible due to asbestos exposure. Pleural thickening can cause shortness of breath and chest pain.
  • Pleural Plaques: These are areas of localized thickening or calcification of the pleura, typically occurring after long-term exposure to asbestos. Pleural plaques do not usually cause symptoms but can be an indicator of increased risk for other asbestos-related diseases.

Handling Asbestos Safely

If you suspect your home contains asbestos, it is crucial to take proper precautions to avoid disturbing the material and releasing fibers into the air. Here are some essential tips for safely handling asbestos:

  • Do not disturb the material: If asbestos-containing materials are in good condition, leave them undisturbed. If they are damaged or deteriorating, seek professional help to assess the situation.
  • Hire a professional: If you need to have asbestos-containing materials removed or repaired, hire a licensed asbestos abatement professional. They have the necessary training, equipment, and expertise to handle asbestos safely.
  • Use proper protective equipment: If you must handle asbestos-containing materials, wear appropriate personal protective equipment (PPE), including a respirator with a high-efficiency particulate air (HEPA) filter, disposable coveralls, gloves, and goggles.
  • Avoid using power tools: Do not use power tools, sanders, or high-pressure water hoses on asbestos-containing materials, as these can release fibers into the air.
  • Seal off the area: If you are working with asbestos-containing materials, seal off the work area with plastic sheeting and use a HEPA-filtered vacuum cleaner to minimize the spread of fibers.
  • Dispose of asbestos waste correctly: Asbestos waste must be disposed of in specially marked bags or containers and taken to an approved landfill site. Consult your local waste management authority for information on proper disposal.

Why Was Asbestos Used in Buildings?

Asbestos was widely used in construction materials from the 1940s to the 1980s due to its unique properties, including:

  • Fire resistance: Asbestos is an excellent fire retardant and was commonly used as insulation material in walls, ceilings, and around pipes to protect against fire.
  • Heat resistance: Asbestos is resistant to high temperatures and was often used as insulation for furnaces, boilers, and hot water pipes.
  • Chemical resistance: Asbestos is resistant to many chemicals and was used in materials such as cement, vinyl flooring, and roofing products to increase their durability.
  • Strength and flexibility: Asbestos fibers are strong and flexible, which allowed them to be woven into fabrics or mixed with other materials to improve their mechanical properties.
  • Cost-effectiveness: Asbestos was an inexpensive material to produce and incorporate into various building products, making it an attractive option for the construction industry.

Asbestos Qualities

Asbestos possesses several qualities that made it an attractive material for various applications, particularly in the construction industry:

  • Tensile strength: Asbestos fibers have high tensile strength, which means they can withstand significant amounts of stretching without breaking.
  • Durability: Asbestos fibers are incredibly durable and resistant to wear and tear, making them suitable for long-lasting applications.
  • Resistance to heat, fire, and chemicals: Asbestos is resistant to high temperatures, fire, and many chemicals, which made it an attractive material for insulation, fireproofing, and chemical-resistant applications.
  • Sound absorption: Asbestos fibers have good sound absorption properties and were used in acoustic tiles and soundproofing materials.
  • Electrical insulation: Asbestos is an excellent electrical insulator, which made it useful in applications where electrical insulation was needed, such as wiring insulation and electrical panels.
  • Despite these beneficial qualities, the severe health risks associated with asbestos exposure have led to its widespread ban in many countries, including the United States, where it is heavily regulated.

Asbestos is a naturally occurring mineral that has been widely used in construction materials due to its unique properties, such as fire resistance, heat resistance, and durability. However, asbestos exposure can lead to severe health issues, including asbestosis, lung cancer, and mesothelioma. It is crucial for homeowners to understand the risks associated with asbestos and take appropriate measures to handle it safely. For more information on handling asbestos and the dangers of asbestos please visit The nation's most trusted mesothelioma resource

If you suspect your home contains asbestos, avoid disturbing the material and consult a professional asbestos abatement expert for advice on proper handling and removal. By following the correct safety precautions and working with licensed professionals, you can minimize the risks associated with asbestos and protect the health of you and your family.