Return to site
Return to site

Homeowner's Comprehensive Guide to Hardwood Flooring

Mastering Hardwood Floor Care and Maintenance for Long-lasting Beauty

Hardwood flooring is a popular and timeless choice for many homeowners due to its durability, natural beauty, and ability to add value to a home. However, maintaining and caring for hardwood floors can be a challenge, particularly when dealing with issues such as footprints, humidity, waxing, pet damage, and proper cleaning techniques. In this comprehensive guide, we will explore these topics and provide practical advice on how to maintain and care for your hardwood floors.

How to Keep Hardwood Floors from Showing Footprints

Visible footprints can detract from the beauty of your hardwood floors. To minimize the appearance of footprints, follow these steps:

  • Choose a matte or satin finish: Glossy finishes tend to show footprints and smudges more easily. A matte or satin finish will help reduce their visibility.
  • Clean regularly: Regular sweeping, vacuuming, or dust mopping will help remove dirt and dust that can contribute to visible footprints.
  • Use the right cleaning products: Avoid using harsh or abrasive cleaners, which can leave residue or streaks on your floors. Instead, opt for a gentle hardwood floor cleaner specifically designed for wood surfaces.
  • Encourage a no-shoes policy: Encourage family members and guests to remove their shoes when entering your home to minimize the amount of dirt and moisture tracked onto your floors.
  • Place rugs and mats strategically: Use doormats at entryways and area rugs in high-traffic areas to help capture dirt and moisture before they come into contact with your hardwood floors.
  • Control humidity: High humidity levels can cause hardwood floors to expand and contract, making footprints more noticeable. Maintain a consistent indoor humidity level between 30-50% to minimize these effects.

Does Humidity Affect Hardwood Floors?

Humidity can have a significant impact on hardwood floors, causing them to expand and contract as moisture levels fluctuate. This movement can lead to warping, cupping, or buckling over time, which can damage the appearance and integrity of your floors. To minimize the effects of humidity on your hardwood floors:

  • Maintain a consistent indoor humidity level: Aim to keep the humidity in your home between 30-50%. In drier climates, use a humidifier to add moisture to the air. In more humid environments, consider using a dehumidifier or air conditioner to remove excess moisture.
  • Install a moisture barrier: If your hardwood floors are installed over a concrete subfloor, use a moisture barrier to prevent moisture from seeping through the concrete and damaging your floors.
  • Choose the right wood species: Some wood species are more resistant to moisture and humidity changes than others. Consult with a flooring professional to determine the best wood species for your specific climate and needs.
  • Allow for proper acclimation: Before installing new hardwood floors, let the wood acclimate to your home's environment for at least one week. This will help the wood adjust to your home's humidity levels and minimize the risk of warping or cupping after installation.

Do You Wax Hardwood Floors?

Waxing hardwood floors can provide a layer of protection and enhance their appearance by adding a subtle sheen. However, whether or not you should wax your hardwood floors depends on the type of finish they have:

  • Wax-finished floors: If your hardwood floors have a wax finish, regular waxing is necessary to maintain their protective layer and appearance. You should wax these floors approximately once or twice a year, depending on the level of traffic and wear.

Polyurethane-finished floors: Most modern hardwood floors are finished with a polyurethane coating, which is more durable and low-maintenance than wax. Waxing is not recommended for these floors, as it can create a slippery surface and interfere with the adhesion of future refinishing treatments. Instead, focus on regular cleaning and maintenance to keep polyurethane-finished floors looking their best.

To wax your wax-finished hardwood floors, follow these steps:

  1. Clean the floor: Thoroughly clean your hardwood floors by sweeping, vacuuming, or dust mopping to remove dirt and debris.
  2. Choose the right wax: Use a high-quality, solvent-based paste wax specifically designed for hardwood floors. Avoid liquid waxes, which can leave residue and streaks.
  3. Apply the wax: Using a clean, lint-free cloth or wax applicator, apply a thin, even layer of wax to the floor, working in small sections. Follow the grain of the wood and avoid applying too much wax, which can create a build-up.
  4. Buff the floor: After allowing the wax to dry according to the manufacturer's instructions (typically 10-30 minutes), use a clean, lint-free cloth or a buffing machine with a soft pad attachment to buff the floor in circular motions. This will help to remove any excess wax and create a smooth, even sheen.

 

Can Dog Nails Scratch Hardwood Floors?

Dog nails can potentially scratch hardwood floors, particularly if they are made from a softer wood species. To minimize the risk of scratches and damage from pets:

  • Choose a harder wood species: Harder woods, such as oak, maple, or hickory, are more resistant to scratches and dents. Consult with a flooring professional to determine the best wood species for your needs and lifestyle.
  • Keep your pet's nails trimmed: Regularly trim your dog's nails to minimize the risk of scratches. Consider using a nail grinder for a smoother, rounded edge.
  • Use area rugs and runners: Place area rugs and runners in high-traffic areas and along your pet's favorite paths to help protect your floors from scratches.
  • Implement a no-running policy: Encourage your dog to walk, rather than run, indoors to minimize the potential for scratches and damage.
  • Consider refinishing options: If your hardwood floors do become scratched, consider refinishing or recoating them to restore their appearance and protective layer.

How to Use Bona Hardwood Floor Cleaner

Bona Hardwood Floor Cleaner is a popular, water-based cleaner designed specifically for hardwood floors. It effectively removes dirt, grime, and stains without leaving residue or damaging the finish. To use Bona Hardwood Floor Cleaner:

  1. Remove loose dirt and debris: Before using Bona Hardwood Floor Cleaner, sweep, vacuum, or dust mop your floors to remove any loose dirt and debris.
  2. Spray the cleaner: Holding the Bona spray bottle about 6 inches from the floor, lightly mist a small area of your hardwood floor with the cleaner. Avoid saturating the floor, as excessive moisture can damage hardwood.
  3. Mop the floor: Using a microfiber mop or Bona's dedicated mop system, gently clean the sprayed area using a back-and-forth motion. Follow the grain of the wood and work in the direction of the floorboards.
  4. Allow the floor to dry: After mopping, allow the floor to dry naturally. The floor should dry quickly, typically within 2-3 minutes.
  5. Repeat as necessary: Continue the process, working in small sections, until your entire hardwood floor has been cleaned.

 

Hardwood flooring is a beautiful and valuable addition to any home, but it requires proper care and maintenance to preserve its appearance and longevity. By following the advice provided in this comprehensive guide, you can effectively address common concerns such as footprints, humidity, waxing, pet damage, and cleaning to ensure your hardwood floors remain in excellent condition for years to come.

 

Subscribe
Previous
Homeowner's Comprehensive Guide: Preparing Your Home for...
Next
Home Renovation Planning in Vancouver: A Comprehensive...
 Return to site
Cookie Use
We use cookies to improve browsing experience, security, and data collection. By accepting, you agree to the use of cookies for advertising and analytics. You can change your cookie settings at any time. Learn More
Accept all
Settings
Decline All
Cookie Settings
Necessary Cookies
These cookies enable core functionality such as security, network management, and accessibility. These cookies can’t be switched off.
Analytics Cookies
These cookies help us better understand how visitors interact with our website and help us discover errors.
Preferences Cookies
These cookies allow the website to remember choices you've made to provide enhanced functionality and personalization.
Save