Return to site
Return to site

High Quality Professional Electrical Services

Professional Electricians in Vancouver, Burnaby, Richmond, North Vancouver and West Vancouver

Electrical services are considered all services related to electrical installations. They are one of the most requested services from our customers.

Each home has a variety of electrical appliances and lighting that require delivery, installation, construction and maintenance.
 
Proper connection of the mains is of particular importance for your safety.
 
That is why you should trust a professional electrician when you need to:
 
 

  •  Repair and design of new household and industrial electrical installations and power boards
  • Insertion and replacement of power switch, contacts, lighting fixtures
  • Replacement of ordinary lighting with energy-saving LED lighting
  • Installation of all types of electrical appliances - stoves, boilers, washing machines, etc.
  • Construction of intercoms and bell installations
  • Staircase lighting
  • Installation of special lighting and sound systems, etc.

Building a New Electrical System

The construction of a new electrical installation by Multigroup Property Services begins with an initial consultation at which we have to estimate how many consumers will the grid have and with what capacity. To this end, we consider the capabilities of the electricity provider to prevent the installed capacity from exceeding the permitted capacity and from igniting the installation.
 
After inspecting your condo, house or office that needs a new electrical installation, our electricians consider whether it will be powered by single-phase or three-phase power. The three-phase power supply enables more consumers to be connected, thus distributing the load evenly. However, the type of power supply is stated initially when contracting with the electricity provider and we only determine what it is before we start work.
 
Following is the preparation of a detailed project that takes into account the number and capacity of existing consumers. On this basis, the location of the electrical panel, the number of electrical circuits, the section of the wires (cables) and the power of the fuses are determined. The use of the correct fuses, with the correct rated current and the operating time is of the utmost importance to ensure safety, reliable operation and avoid future accidents. Sometimes adding consumers requires resizing the wiring to avoid accidents and ensure proper operation. One example is pyrolytic cleaners, which are large consumers and often require such resizing.

Multigroup's Electricians and Electrical Engineers work according to the latest building regulations.
 
It is compulsory for all consumers and contacts to be grounded (for three-wire installations) or grounded (for two-wire installations).

Laying of cables for electrical installation

Before laying the cables, we must determine their section, which is related to the power of the fuse, the method of laying and the route where it will be laid. It is important to note that using the wrong type of cable can pose serious risks to the home and its occupants.
 
Before starting work, determine where the cables will go from - high to low or low, as well as the locations of switches, luminaires and sockets. Then we start laying the cables themselves. If the site permits, the cables can be closed in corrugated pipes or directly in the plaster or behind plasterboard. After laying the cables, the electrical panel is installed and finally our electricians ring the electrical installation to check that everything is working properly.
 
The installation of the switches, sockets and illuminating bodies is carried out after the completion of the finishing works and are the final element of the construction of a completely new electrical installation.
 

Other Electrical Services

Some of the other electrical services we offer are replacing old bulbs with the latest generation of new LED lighting - bulbs, LED bars, etc., as well as mounting child protection on power outlets.
 
Our team of professional electricians will respond immediately to solve problems with your electrical installation or to build a new one!
 
Contact us at (778) 513-0333 or info@multigroup.ca

Subscribe
Previous
Professional Iron and Metal Services in Vancouver
Next
Junk Removal in Vancouver
 Return to site
All Posts
×

Almost done…

We just sent you an email. Please click the link in the email to confirm your subscription!

OK