Return to site

DO YOU NEED AN OFFICE RENOVATION ?

Choose a Job You Love, and You Will Never Have to Work a Day in Your Life

February 8, 2020

Does Your Office Need to be Renovated?

Against the backdrop of most luxurious office buildings offering modern and stylish offices, the working environment in offices premises that have not been updated recently is starting to look outdated very fast.
 
That's why it's time to think about freshening up or overhauling your office!
 
The positives that will come after a quality repair of an office, in addition to the visual change, also include greater productivity and greater motivation to fulfill the team duties

Office Renovation - Steps of Implementation

In carrying out each repair of an office we head into, we follow certain steps to ensure the best coordination and communication between us.Add paragraph text here.

Inspection and consultation
 
After contacting us, a representative of Multigroup Property Services will visit your office on site to discuss everything that will be required to begin the renovation work. It is important for us not to disrupt the workflow of your company, so our team is ready to renovate the office outside of business hours.
 
The most important things to determine at the beginning are:
 
- where and how many work stations will be available
- where the power outlets will be located
- where the internet cables will be located
- where the server will be located - in a separate room or in a special cabinet

The Renovation Process

Execution of the Renovation Work
 
After specifying all the details of the upcoming repairs, our master builders are getting to work.
 
This is the standard work process :
 
- Demolition
- Framing, Plumbing, Electrical, Low Voltage, Sprinklers

- Design and implementation of lighting with the possibility of building energy-saving LED lighting
- Drywall, Mudding, Taping

- Ceilings
- Installation of doors and partitions for premises

- Paint
- Design, manufacture or supply of office furniture
- Location of office equipment
- Post Construction Cleaning
 
 
Depending on the individual wishes of our clients, the walls can be painted in corporate colors with the possibility of affixing the corporate logo.
We also offer interesting solutions for the separation of different workplaces and premises - special glass partitions can be placed, as well as movable partition systems that allow you to transform workplaces quickly and easily.