Return to site
Return to site

Condo Renovations from A to Z

Everything you need to know about your Condo Renovation in Vancouver

Multigroup Property Services offers specifically for you - our clients - everything you need for a quality condo renovation!
 
To feel comfortable where you live, constant care of the property is needed over a period of time.

What to Choose for Your Condo Renovation?

The choice of the right type of renovation for your condo depends on several factors - when was the last time you refreshed your condo, what financial resources you have and how long the renovation would take.
 
For most people, condo renovation seem complicated and they constantly put it off. The truth is that it all depends on the construction company that you choose to transform your home.
We realize that the most important thing is Your comfort during the renovation work in your condo and our main mission is to work clean, with quality and unnoticed to reduce our disturbance to your daily life.

Inquiry, Consultation and Estimate for Condo Renovation

Once you have decided on this step and you are ready to begin your condo renovation that will turn your home into the dreamy place to live, just contact us!
 
We will arrange a free consultation in your apartment at a time convenient for you and will advise you on what is best - where to start the renovation work, we will talk with you to understand what exactly you have in mind and how we can best perform it, what is needed as preparation , how long it will take to do the renovation and answer all the questions you have.
 
We will then provide you with a detailed estimate with prices for the renovation of your condo and upon your consent, we will start working immediately.

Complete Condo Renovation

A complete condo renovation is considered the complete change of your home - renovation carried in all of the rooms:
 
- Bathroom renovation
- Kitchen renovation
- Bedroom renovation
- Living Room Renovation
- Renovation of intermediate premises - corridors, closets, etc.
 
A complete renovation of condo usually takes longer than partial renovations, but the result is the most impressive. After its completion, you will be very excited to live in your renovated home!

The major condo renovations start with the demolition, dismantling and removal of everything old and unnecessary, and we guarantee the disposal of construction waste at the end of each day:
 

  • Dismantling of doors
  • Removal of carpets, linoleums, parquets, tiles
  • Removal of wallpapers
  • Removal of partitions (non-load-bearing), if necessary

 

After the first stage, the complete renovation of the apartment continues with:

  • Changing all of the interior doors
  • If necessary, change of the sewerage and water supply network
  • Design and installation of new electrical network with replacement of power outlets, switches, etc.
  •  Replacement of the heaters, if necessary

 
The following is the preparation for the final renovation of the apartment:
 

  • Laying of internal insulation
  • Leveling of floors and walls
  • Construction of partition walls with drywall
  • Straightening of the ceiling, if required
  • Tile and grouting

The last stage of the complete condo renovation includes:
 

  • Painting with different types of latex to your taste, applying wallpaper, applying decorative plaster
  • Laying of the flooring - different types of parquet, possibility for rearrangement, tiling and varnishing of old parquet, installation of hardwood, vinyl, carpet
  • Installation of lighting fixtures in all rooms as well as sockets and switches
  • Installation of bathroom sanitation
  • Installation of kitchen appliances

 

and .... deep post construction cleaning!

Now you can enjoy the wonderful new home that we have created with great desire and diligence for you!

Partial Condo Renovations

Partial condo renovation involves repairing only some of the rooms in your home, for example:
 
- Remodel of the kitchen
- Bathroom Remodel
- Remodel of the living room
- Remodel of corridors and closets
 
The stages of partial condo renovations are:
 

  • Dismantling and Demolition everything that is no longer needed - removing wallpapers, carpets, linoleums, parquet
  • Demolition of tiles, marble, granite
  • Replacement of switches, sockets and light fixtures
  • Latex repainting
  • Replacement of interior doors
  • Change of bathroom sanitation
  • Replacement of plumbing and electrical installation
  • Laying of new flooring, etc.
     
    Partial condo renovation is for those of you that do not have the means to complete a complete renovation or have only a room or two that you are unhappy with.

Refreshing Renovation of a Condo

The refreshing renovation of condos include very basic cosmetic changes on the premises. Such renovations are suitable for the yearly maintenance of a recently renovated condos.
 
Main activities for refreshing the condo:
 

  • Latex repainting
  • Change of flooring
  • Laying of decorative plaster
  • Scraping and varnishing of old parquet
  • Changing wallpapers and more.

Luxurious Renovations of Condos

Luxury apartment and condo renovations are one of our favorite!
 
With them you can stir your imagination and thus create a home that you dream of.
 
We can fulfill all your wishes! Luxury apartment repairs are very individual and each one is different from the previous one.
 
We have interior design specialists who will advise you on everything related to colors, furniture and layout of the individual elements, so that the end result will bring you maximum enjoyment!
 
The possibilities for luxury apartment repairs are unlimited. You can build fancy plasterboard shapes, install concealed lighting, build columns and arches and whatever you want!

You provide the dreams, we provide the implementation!

 
If you would like to discuss a luxury renovation project for your apartment, contact us (778) 513-0333 !

Multigroup Property Services guarantees 100% satisfaction!

 

Subscribe
Previous
Office Renovations in Vancouver
Next
Bio and Green Renovations from Multigroup
 Return to site
All Posts
×

Almost done…

We just sent you an email. Please click the link in the email to confirm your subscription!

OK