Return to site
Return to site

Bathroom Renovations in Vancouver

Everything you need to know about your bathroom renovation

Do you need a bathroom renovation? You have come to the right place!
 
Whether you need major or partial repairs or construction of a new bathroom, Multigroup Property Services professionals are ready to give their time and experience entirely to you.
 
Quality renovation of the bathroom is of utmost importance for every home. A job well done and using only proven materials will save you time and money in the future.
 
That is why it is important to entrust this responsible task to the right construction company!

Steps for Bathroom Renovation

Bathroom renovations are performed in a special sequence:
 
- Dismantling of sanitation and sanitary appliances
- Removing the old tiles and bathtub
- Installation of pipes, cables and others

- Drywall
- Leveling the floor
- Laying of waterproofing materials
- Tiling and grouting
- Installation of sanitary appliances such as a sink, bathtub, walk-in showers etc.

Bathroom Renovation - Step by Step

Consistency of action in bath renovations is key to achieving a great end result. Below you will learn the detailed steps that will take you to the bathroom of your dreams!
 
Before starting the repair work, we make an overview and draw up a complete plan for the vision of your bathroom. This plan includes detailed sketches of the sanitary layout - where the sink, shower and siphon will be located, what type of lighting will you prefer, whether or not there will be insulation and anything else we will need for further action.

Toilet

First, we need to consider the toilet with the sewer system, as it may be hardest to move later! The toilet is nice to have a built-in structure (when the cistern is hidden in the wall) and a toilet bowl that is clamped directly to the wall, not stepping on the floor. Besides the modern and beautiful, the console toilet is also much more hygienic - the space under it is cleaned very easily and quickly. The built-in tank can also be serviced and cleaned directly through the button.
 
Some of our clients order the toilet to be installed with a bidet as an extra. The options are endless !

Sink

The sink is another important part of the bathroom vision! It should be tailored to the size of the room - smaller bathrooms require smaller sinks, but if you have enough space you can pamper yourself with a large or even double sink!
 
Sinks are usually ceramic, and the cabinetry must be PVC. These cabinets are waterproof and much better than MDF cabinets, which swell when wet. Again, the cabinet can be mounted to the wall for easier floor cleaning and a cleaner, contemporary look.

Shower

There are several options for showers - you can have a regular shower, in a bathtub a walk-in shower or a shower cabin with a base. Shower base are porcelain or acrylic, and we recommend porcelain as they are more beautiful and more durable!
The shower can be separated from the rest of the bathroom by building a glass partition or panel. The shower can be equipped with special hydromassage nozzles, you can put a pebble-covered seat like in the spa centers and everything else you can think of!

Drain

The drain is a small but significant part of the quality of your bathroom! It is good to make a linear drawin, with a built-in chute to it, to drain the water in the direction you want.

Faucets

There are 2 types of faucets - built-in or regular - standalone. One is mounted on the sink, the other on the wall. Nowadays, stores are full of modern faucets, such as those that have a thermo head and you can adjust the temperature and the water mixer maintains it. This feature is extremely handy.

Bathroom Fan

How to prevent mold on the ceiling? Through the fan! Fans can be installed by using a flat air duct to save space. A suitable location for the fan is the space near by the shower where moisture is most abundant.
 
For faster drying of the bathroom floor, heated floors help! The feeling of stepping on warm tiles is amazing!

Ceiling

Another option to drywall ceilings is to build a ceiling made of vinyl, and then it can be illuminated, for example with a diode strip, thus creating the effect that the ceiling itself lights up. Recently, we have been fulfilling a lot of wishes for print on cloud, sky, moon or whatever you want - something new, beautiful and modern!
 
For more luxurious bathroom renovations, we usually install speakers in the ceiling, smart thermostats, smart blinds. This is a great way to make this place even cozier and more enjoyable!

Lighting

Bathrooms must have a main source of light, a secondary source of light above the mirrors and LED strips can be added for further comfort. The LED strip can be colored and the colors can change depending on your mood.

Bathroom Tiles

Bathroom tiles are an essential element in the renovation of any bathroom. Bathroom tiles can be made of stone (for a more luxurious look), glass ceramics - small tiles 2x2 cm like in the swimming pools, ceramic or terracotta.
 
One of the most important things to remember is that all tiles have joints to counteract the temperature differences. Different colors of grout are already available to fit different tile colors. After grouting, the grout is sealed for a longer lasting clean look.
 
If you want to protect yourself from leaks in other rooms, then it is good to put waterproofing under the tiles.

Mirror, bathroom door, pipes

One of the final elements we will mention is the mirror, behind which can be placed heating so that it does not sweat from the steam, which is something that must be foreseen in the beginning to lay the necessary cables.
 
Existing pipes are closed with drywall and a decorative grille is put in place to allow air to circulate. The grilles can be metal, plastic or aluminum.
 
The choice of bathroom doors is also wide - the door can be moisture resistant, glass, aluminum, with or without a mirror. It all depends on your personal preferences!

So, now after all you have learned about bathroom renovations, you can now plan your dream bathroom! Just contact us and we will fulfill all your wishes!

(778) 513-0333

Subscribe
Previous
Professional Cleaning in Vancouver and the Lower Mainland
Next
Office Renovations in Vancouver
 Return to site